| Flush Toilets | Major Project to install holding tank, move building, new fixtures, plumbing, water supply, power supply. A committee is required to plan the work and execute it. Knowlegeable people required in all areas | ASAP | Phil (416) 284-0361 | | 1 |
| Awning | Purchase and Install new hold down lugs | ASAP | Phil | 2 people required | 1 |
| Litter Clean-up | Pick up litter from the entire clubhouse area/parking lot and rake the beach | Early August | Phil (416) 284-0361 | 2 persons required | 1 |
| Garbage Containers | Assist in the design and then fabricate 4 refuse containers. Can be prebuilt at home. 1 - 2 people required | To Be Determined | Phil (416) 284-0361 | | 1 |
| Windows | Wash the windows on the clubhouse | Early August | Phil (416) 284-0361 | | 1 |
| Fireplace fan | Install hard wire under floor, install receptical 3 people required | To be Determined | Phil (416) 284-0361 | Assigned to 2 people | 5 |
| Propane Tank Storage | design and build a propane stirage unit for 6 full tanks and about 4 empty tanks - one person | ASAP | Phil (416) 284-0361 | Assigned | 5 |
| Solar Lighting System | Design system, purchase parts, install, - 4 people required | ASAP | Phil (416) 284-0361 | Assigned | 5 |
| Kitchen Sink | Paint the counter inside and out | ASAP | Phil | Completed | 9 |
| Oar Shed | Clean out/organize the storage room in the back of the oar shed 2 people required | To be Determined | Phil (416) 284-0361 | Completed | 9 |
| Fire Pit Wood Pile | Remove danger nails from the wood and restack pile | ASAP | Phil | Completed | 9 |
| Flag Pole | Replace the guy wires and straighten pole - 4 people required, at least one with rigging skills | ASAP | Phil (416) 284-0361 | Completed | 9 |
| Install Counter in Clubhouse | Remove old counters/shelves/cupboards, build new base, install counter, install counter top, tile the top, wash the cupboards, | April 16-18 | Phil (416) 284-0361 | Completed | 9 |
| Docks-In Replace waterfront fence rope | Reattach the rope - 2 people required | April 19 | Phil on Site | Completed | 9 |
| Docks-In Litter Clean Up | Rake the area for litter 3 people required | April 19 | Phil on Site | Completed | 9 |
| Docks-in Fix Picnic Table legs | replace three legs - 2 people required | April 19 | Phil on site | Completed | 9 |
| Docks-In Wash Windows | Wash Windows - 2 people required | April 19 | Phil on Site | Completed | 9 |
| Docks-In Remove dead tree/branches | Cut down one tree and trim one branch 2 people required | April 19 | Phil on Site | Completed | 9 |
| Book Shelf on wall at fireplace | Purchase shelf (IKEA sort of thing), install, clean-up wiring, re-install radio | To be determined 2 people required | Phil (416)284-0361 | Completed | 9 |
| Sink in kitchen | Build counter, install sink, plumbing, dig dry well, paint counter | To be determined | Phil - (416) 284-0361 | Completed | 9 |
| Retreive Picnic Tables from Lake | 2 picnic tables used for temporary dock need to be removed from lake and repaired 3 people required | As soon as workboat is available | Phil (416) 284-0361 | Completed | 9 |